Glossary entry (derived from question below)
английский term or phrase:
rolling bund
русский translation:
(стальной) передвижной барьер
Added to glossary by
Tatiana Karymshakova
Jan 12, 2018 08:46
6 yrs ago
английский term
rolling bund
английский => русский
Техника
Горное дело и полезные ископаемые / Драгоценные камни
Шахты, разрезы
Once the waste has stopped rilling, the bogger stop is removed and a ***“rolling bund”*** installed to complete the filling of the stope in order to prepare the stope floor for the next stoping block to be extracted.
Proposed translations
(русский)
3 | (стальной) передвижной барьер | Enote |
Proposed translations
1 час
Selected
(стальной) передвижной барьер
bund - это барьер (насыпь или вал) для предотвращения доступа к опасному участку, см., например, рис. 2 и текст в руководстве по ТБ в шахтах https://www.dnrm.qld.gov.au/__data/assets/pdf_file/0019/2403...
rolling bund - это передвижной защитный барьер (металлический)
Цитата из отчета по расследованию гибели оператора ПДМ на шахте, стр. 8
http://www.coronerscourt.wa.gov.au/_files/Ross_finding_2014....
37. At the 1A ore body, backfilling of stopes was generally done with loaders from the top levels. When backfilling of a stope was carried out, procedures required the use of a steel ‘bund’ or ‘wheel stop’ to be fixed at the top level at minimum of 1.5 metres from the edge. The steel bunds were bolted to the drive walls with chains. The use of bollards and signs was required, and flood lights were required to be used at six metres and 10 metres from the tipping points.
rolling bund - это передвижной защитный барьер (металлический)
Цитата из отчета по расследованию гибели оператора ПДМ на шахте, стр. 8
http://www.coronerscourt.wa.gov.au/_files/Ross_finding_2014....
37. At the 1A ore body, backfilling of stopes was generally done with loaders from the top levels. When backfilling of a stope was carried out, procedures required the use of a steel ‘bund’ or ‘wheel stop’ to be fixed at the top level at minimum of 1.5 metres from the edge. The steel bunds were bolted to the drive walls with chains. The use of bollards and signs was required, and flood lights were required to be used at six metres and 10 metres from the tipping points.
4 KudoZ points awarded for this answer.
Something went wrong...